• info@trans-ts.az
  • +99450 966 34 01
Installation

Establishing alternative energy stations

Our company was the first in the Republic to prevent exploitation by installing a 100 kVA power generator on the territory of the Qaradağ region of the city of Baku.

Time of the Work

Our company has facilities for the construction, reworking and repair of energy objects, equipment and structures.

Fellowship

Currently, our company has business relations with countries such as Germany, Denmark, Ukraine, Iran, Iraq, Moldava, Turkey, Italy, Cyprus (Northern), Belarus and Russia.

Quality of Work

Our company was the first in the Republic to prevent exploitation by installing a 100 kVA power generator on the territory of the Qaradağ region of the city of Baku.

We are different

Our company has been in business for a long time with the leading banks of Europe, namely Commers bank, Landes bank, DZ bank and Deutsch bank.

img
circle_right About us

What do we do?

TRANS-T.S.” MMC was created on 15 May 2002 and operates in the following directions:
Production, installation and repair of 35/6-10 kV-luq, 1.6-16 MVA oil transformers,
Production, installation and repair of 35/0.4 kV, 100-2500 kVA oil transformers,
Production, installation and repair of 6-10/0.4 kV, 25-2500 kVA transformers,
Deploying and erecting 0.4-110 kV metal supports,
Production, installation and shelter of 6-10 kV internal and external complex splitter installations of KSO, KRUN type, complexed with vacuum openers,
Complexing with high and low voltage air and cable electrical equipment,
Production of 630-1600 A 10.35 kV-luq vacuum openings,
Production, installation and installation of ŞO-70 type 0.4 kV splitter electrical switchgears
Our company was the first in the Republic to prevent exploitation by installing a 100 kVA power generator on the territory of the Qaradağ region of the city of Baku. Currently, together with the International Eco-Energetics Academy, we are about to complete the project of installing 4 power generators of 900 kVA each, with a total power of 3.6 MVA, in the land of Xızı district.

He sings “TRANS-T.S.” MMC has implemented the following important projects on the territory of the Republic:

circle_right
411+

Product Delivery

249+

World Wide Branch

3+

Mordern Transport

6+

Awards Winning

circle_right THOSE WHO LIKE OUR WORK circle_left

Customer ratings

Texniki xidmətlərinizi çox bəynirəm

img
Jale Muradli
Texnik
img

Layhələrinizdə iştirak etmək mənə çox xoş idi

img
Ayan Cavadova
Mühəndis
img
circle_right OUR BLOGS circle_left

News from us

Lorem Ipsum
  • 06.07.2021 18:24

Lorem Ipsum

Lorem Ipsum has been the industry standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled but also the l...

Lorem Ipsum
  • 06.07.2021 18:24

Lorem Ipsum

Lorem Ipsum has been the industry standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled but also the l...

Lorem Ipsum
  • 06.07.2021 18:24

Lorem Ipsum

Lorem Ipsum has been the industry standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled but also the l...

ref
ref
ref
ref
ref
ref
ref
ref
ref
ref
ref
ref12